Fives RFQ Data Sheet for warehouse automation requirements

A compact requirements checklist for warehouse automation RFQs. Capture load units, peak windows, WMS/WCS/PLC ownership, accumulation depth and acceptance evidence before capital locks.

Requirements matrix

Structured Fives RFQ fields teams should freeze early

Fill every row with a measurable boundary. Empty cells become negotiation risk during FAT/SAT. Planning ranges are not independently verified public claims.

RFQ field What to capture Example planning band Owner
Load-unit contract Dimensions, weight bands, overhang, lid rules Carton 200–600 mm; tote lid on/off Operations + engineering
System throughput Design vs peak order lines/hour with SKU mix Design + 1.7–2.1× peak window Intralogistics engineer
Zero-pressure accumulation Zone count, buffer occupancy, jam recovery Occupancy limit + recovery minutes Controls engineer
Divert accuracy Sample size, false-divert rate, recirculation cap Witness sample under live mix Automation controls
Interface cycle time WMS/WCS/PLC handshake and exception timeout Timeout seconds + restart owner IT/OT integration
System availability Subsystem and end-to-end measurement boundaries Stated with MTTR path Maintenance + EHS
Palletizing pattern Recipes, layer stability, retest after change Pattern ID + retest trigger Production logistics
Site constraints Aisle width, floor quality, mezzanine clearances Clear width mm + access notes Capital procurement
Evidence checklist

Fives RFQ checklist before you request a quote package

Use this list as an intake gate. Reference frameworks are review topics, not certificate logos for a named model.

RFQ commitment statement

Fives commits to evaluating conveying, sortation and palletizing proposals against the fields above—not against isolated brochure meters-per-minute. If a vendor cannot state peak factor, accumulation depth, interface timeouts and retest triggers, the RFQ remains incomplete.

Known limits: Design rates collapse when SKU mix or polybag compression changes mid-window; divert accuracy samples do not transfer across load-unit classes; remote diagnostics may be blocked by OT policy; brownfield mezzanines can make mean time to repair longer than greenfield aisle geometry implies. Functional safety / performance level (PL) topics are listed for review—they are not certificate marks for a named model.

Trade-off reminder: Fixed automation can raise deterministic capacity while flexible robotics shortens layout change cycles; peak order lines per hour can conflict with buffer occupancy and graceful degradation. State which side of each dispute your capital case actually needs.

Submit your Fives RFQ Data Sheet package

Send the completed checklist with load, flow and interface notes. Fives routes it into one engineering queue.